University of West England (UWE) – Bower Ashton Campus

All drawings and coordination carried out using revit from start to finish (stage 3 to stage 7).

We provided

  • full asset information for use with UWE facilities management team, using COBie parameters
  • clash detection throughout development of the M&E design, and with that of other disciplines
  • all 2D drawings provided from the revit model
  • level of Development (LOD) up to 400 as defined BIM forum Level of Development Specification
  • model outputs in IFC, RVT, NWD/NWC, DWG as requested
  • all works throughout the project carried out to UWE BIM Protocol standards, relevant national BIM standards (BS 1192) & guides, and as agrred with all stakeholders in BIM execution plan