All M&E drawings and coordination carried out using Revit throughout (stage 3 to stage 6)

  • clash detection throughout development of the M&E design, and with that of other disciplines using
  • navisworks manage and regular clash detection workshops
  • all 2D drawings provided from the revit model
  • level of Development (LOD) up to 350 as defined BIM forum Level of Development Specification model outputs in IFC, RVT, NWD/NWC, DWG as requested
  • all works throughout the project carried out to relevant national BIM standards (BS 1192) & guides, and as agreed with all stakeholders in BIM execution plan