Client                 Smart Systems

Value                  £5 800 000

Location             Yatton, North Somerset

Project              15 000 sq ft Factory Production Line Extension

 

Design of the mechanical and electrical systems to support a new production and warehouse facility including:

Enabling works to the existing HV mains and medium pressure gas supply

  • installation of wind Turbines
  • installation of new paint plants
  • installation of new ventilation systems
  • modifications to compressed air systems
  • modification to industrial water and demi water serving a new vertical paint plant
  • general lighting, power and fire alarm systems
  • new process cooling water systems to support the installation of a new aluminium press
  • evaporative cooling systems to the existing production warehouse
  • M&E services to new office accommodation
  • fire hydrant mains and hose reels

Preparation of a sustainability and energy report for planning purposes as well as general advice on renewable energy solutions

  • daylight dimming installed to reduce energy consumption from artificial lighting
  • two 500kW wind turbines installed at the Smart Systems site
  • 650kWp of roof mounted Photovoltaics installed
  • energy efficient gas fired boilers installed to serve staff areas